Home / Blog / Initiation : Testability Concept

In the early stages of a project developers tend to concentrate on the design itself, in order to meet project schedules and budgets. The result of this approach often leads to systems that cannot be checked and proven. The e2eS team specializes in integrated engineering, where in each step of the project they encounter issues parallel to the design. In the early stages of the project, where only the project-based collections are put forward, the team plans a testability plan to the standards of a “black box” and prepares for proof of product, its production and maintenance.
With the progress of the design, the team incorporates points of excitation and testing points and interfaces tests for the system. “The Black box” with which the process began, becomes a “Transparent Box” which allows access to any points needing investigation. So the system can be checked in any stage of development including the product proof stage and even during production, service and maintenance.